Project Summary At a prominent confectionery site in York, Newsome has implemented a high-capacity 400 kW chiller, marking the noteworthy execution of the project. Designed to reinforce ESG targets, the installation boosts system dependability while cutting overall power consumption and CO₂ emissions. https://210list.com/story21410332/advanced-400-kw-chiller-installation-secures-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving