Initially, the Jai Hind metro station was prepared being elevated. On the other hand, the AAI objected the elevated stretch up into the airport could pose a menace to aircraft, Therefore the route was further reworked as well as the station was shifted underground, 150 m from the Airport terminal developing. https://tysonfvjvh.like-blogs.com/31999600/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf